[Skip to content]

Apex Building & Roofing

EBC, FMB logos

Details

53 Fennels Way, Flackwell Heath, High Wycombe, Buckinghamshire, HP10 9BX
  • Roofing Contractors
  • Brickwork Contractors
  • Extensions
  • Building Contractors
  • Conservatories
  • Design and Build
  • Fascias
  • Flat Roofing
  • General Builders
  • Garage Conversions

Ask Apex Building & Roofing to quote for your job

Request quote

The easiest way to find a tradesperson for your project is to use our Find A Builder service. We have thousands of vetted members nationwide.

Tick - medium

FMB Member

  • Has a minimum of twelve months trading
  • At least two references have been provided for Apex Building & Roofing, one client reference (preferably from a work in progress) and one professional reference
  • Public and employer liability insurance (if applicable)
  • VAT registration (if applicable)
  • Confirmation of business address/details
  • Apex Building & Roofing has agreed to abide by the FMB Disputes Resolution and Complaints Procedures
  • Has signed up to the FMB Code of Practice
  • Can offer the suite of Build Assure warranty products for the domestic and commercial markets (contact the NRWB office for rates)

Member Profile

Member image

Apex Building and Roofing have been established since 1970 with over 40 years of experience serving both domestic and commercial customers in Buckinghamshire and Berkshire and the surrounding areas.

Quality materials combined with professional workmanship have helped establish Apex Builidng and Roofing as one of the leading companies in the area. We carry out all your building requirements from extensions and refurbishments to, a complete new build.  Our team are professional and curtious and have a commitment to achieving high standards.

Apex Building and Roofing are a family run business which prides itself on offering a quality service from our initial site inspection right through to the completed job. We have thousands of satisfied clients and are proud that with such a large client base we receive over 50% of new work from previous client recommendations.

As well as serving domestic clients we have worked and continue to complete larger contracts. We have successfully completed contracts amongst others for the National Trust Wokingham Utility Chiltern Council Slough Council Lexmark Pangbourne College Great Marlow School Flackwell Heath Golf Course.

We are members of the "Federation of Master Builders" and are an approved Contractor for RubberBond FleeceBack EPDM.  We are based in Flackwell Heath near High Wycombe in Buckinghamshire and in Wokingham in Berkshire. Between our two offices we cover a large area which encompasses all of Bucks Berks and Oxfordshire. We offer a free no obligation written quotation. With low overhead costs we are able to offer a sensible pricing structure making us one of the most competitive in our field.

Case Study 1

House Build

The Original property here was a 1930's 2 bed Bungalow.  This was demolished and replaced with a 4 bed detached house.  We liased with local building control and NHBC when constructing the property.  The house was completed to a high standard throughout with a bespoke oak staircase and oak doors and flooring.  We installed a new kitchen/utility and three new bathrooms.  All decoration and flooring was undertaken by our team, along with a complete design of internal lighting.  The project took a total of 12 months to complete.

Case study 1 picture 1
Case study 1 picture 2

Case Study 2

Side and Rear Extension

This house was extended to the side and back.  The stairs were totally repositioned and the downstairs living space was knocked through to create an open plan living room and kitchen.  We extended two of the upstair bedrooms and created a new en-suite to the master bedroom.  We installed a new kitchen and totally refurbished the downstairs living space, redecorating throughout and fitting new engineered oak flooring throughout.  A new megaflow heating system was installed with  30sqM of underfloor heating in the kitchen area.  The house was rewired throughout.  The project took 6months to complete.

Case study two picture 1
Case study two picture 2