Hall Farm House
This is our current project to date 30-08-2011.
This works was to demolish 1 side extension and build new, demolish garage and office space and build new two storey extension, re-instate swimming pool and form cover over, thin out woods and dredge and form fishing pond.
The works to prepare required felling 145 trees at 18m tall and removing all stumps for site preperation.
Works involved with this project are:
- site preparation
- digging of excavations
- foundations
- building works
- all joinery works 1st&2nd fix
- all electrical works 1st &2nd fix
- all plumbing and heating works
- roof works
- UPVC doors and windows
- k-rend external plaster coating
- internal plastering
- landcaping
- job length 12-18 months
- job est cost:£500,000