Full renovation project consisting of,
Full project management by BANN
Walls removed and repositioned including moving doorways to different positions following structural engineers drawings
Electric underfloor heating system bathrooms/wetroom
New electrically opening Velux style windows fitted to hall, wet room, and shower room
Freshly plastered walls and ceilings throughout
New gas central heating system and cast iron radiators. Hive system fitted
Full rewire and bespoke lighting design installed
New shower room
New wetroom/bathroom
New structural opening formed between kitchen and living room
Bespoke book case constructed along wall in living room leading to new kitchen through new structural opening
New kitchen
New window shutters made and fitted
New sash and case windows with slimlite glazing
New bespoke cabinetry fitted throughout-wardrobes, T.V. cabinet, etc.
New extra wide by extra long floor boards fitted throughout
New fireplaces and lining of chimneys
New doors, architraves and skirting boards fitted along with associated ironmongery
Full decoration of entire property
New ventillation system installed