About us:
At City Building Engineering Services we firmly believe in a collaborative approach to doing business. By working together with our clients, we find and deliver constructive solutions to their needs and requirements in a cost effective and efficient way.
 
Our teams of dedicated professionals are passionate about what they do. This has allowed our client base to steadily grow, whilst maintaining a high percentage of repeat business.
 
Throughout our six regional offices we operate nationally with a comprehensive in-house resource allowing the delivery of all aspects of a construction and engineering project from procurement and design through to project management, installation and maintenance.
 
We pride ourselves in being ahead of the curve regarding innovations, particularly about energy saving, where we have planned, designed and installed many cost and energy savings initiatives. CBES is a subsidiary of the City Facilities Management Group.
 
Contact us:
e: [email protected]
t: 0845 674 0017
Or visit our website here.

Trades offered

Commercial builder
Shop fitting
Builder
Builder general
Handyman and maintenance
Refurbishments
Renovations
Bathrooms
Bathroom fitter
Carpenter and Joiner
General carpentry
Joinery
Plasterer
Plastering
Tiler
Floor tiling
Wall tiling
Kitchens
Kitchen installation

Case studies

Store Refresh and Extension, Belfast

  • 09 Oct 2019

As part of our three-year framework agreement with Asda we were awarded the extension and refresh scheme at the Westwood store in West Belfast.

 

The project involved a full store refresh as well as an extension to increase the available sales floor area by 7,000ft2, updating all in store offerings in line with current corporate branding. The project involved a collaborative approach between our construction, refrigeration and fire and security divisions with the construction division acting as principal contractor.

 

The overall works covered all areas of the store including: extending the existing store in to a new retail unit that had been constructed next to the store; new main entrance and relocation of checkouts; replacement of all frozen, chilled and ambient cases; replacement and reconfiguration of all sales floor fixtures; installation of a full new George department as well as new Kiosk, Customer Service Desk, Click and Collect offer and Food to Go.

 

Key facts:

We upgraded the refrigerant gas, fixtures and replaced the refrigeration with a minimum 10-year asset life expectancy.

The full refurbishment and extension were carried out in a live trading store, maintaining full product availability for customers throughout.

The project was featured in the Belfast Telegraph.

M.E.P Services

  • 09 Oct 2019

See more case studies