Case studies

Public Schools - Various -Cambridgeshire

  • 07 Jan 2021
  • Cambridgeshire

Aragon House 14 Apartments - Huntingdon

  • 07 Jan 2021
  • Huntingdonshire

NET LED Retail Warehouse and Offices -Cambridge

  • 07 Jan 2021
  • Cambridgeshire

FCW CONSTRUCTION were Taken on for this development for an expanding low energy lighting manufacturer they needed a larger office Space for the extra staff taken on with Warehousing attached for distribution of stock.

Project Duration 5 Months

Joisting Traditional on Steel Frame
Flooring 6,000 Sq ft
SFS Metal Stud and Independent Wall liner
Dry lining
Plastering
Suspended Ceilings
Breakouts

Intelligent Fngerprinting Laboratory - Cambridge

  • 07 Jan 2021
  • Cambridgeshire

Preistgate House 36 Apartments - Peterborough

  • 07 Jan 2021
  • Peterborough

Orton Centre 62 Apartments - Peterborough

  • 07 Jan 2021
  • Peterborough

Residential Home Extension - Peterborough

  • 06 Jan 2021
  • Peterborough

El’esteem Salon Shop fit out - Peterborough

  • 06 Jan 2021
  • Peterborough

CMR Cambridge Medical Robotics - HQ - Cambridge

  • 06 Jan 2021
  • Cambridgeshire

Peterborough Music School - Peterborough

  • 05 Jan 2021
  • Peterborough

SSE Scottish & Southern Energy HQ - Cambridge

  • 05 Jan 2021
  • Cambridgeshire