Redesigned the bathroom to have a whirlpool, concealed cistern and basin on floating shelf with a wall hung vanity underneath.
All tiling completed.
One very happy client.
This project formed part of the criteria to become a member with the Federation of Master Builders and was inspected by an independent inspection company.
This stunning ensuite renovation involved installation of concealed toilet unit, new shower cubicle new vanity basin, tiling to walls and floor, electrical cable alteration to include new extractor, light and switch.
We were asked to install laminate flooring, re-construct the joinery units and refine the look of this living room following shoddy install by previous Contractor.
We rewired the ceiling lights and completely rewired the kitchen and also incorporated unit lights, replastered walls and ceiling,installed the kitchen, flooring and redecorated the kitchen.
This kitchen project involved ceiling removal, complete re-wiring, new plastering to walls and ceiling, patterned floor tile installation, kitchen unit installation and decoration.