Case studies

Holiday cabin refurbishments External.

  • 13 Nov 2018

Office refit, Neyland

  • 13 Nov 2018

new build Ludchurch

  • 13 Nov 2018

New Shop front and roof, Pembroke

  • 13 Nov 2018

Holiday cabin refurbishments Internal.

  • 13 Nov 2018

In side the holiday cabin referbishments, we removed all non supporting walls and tongue and groove (t&g) cladding, insulated all outside walls. new  timber stud work was errected. the whole building was re-wired. New false A frames were built in. The walls were plaster boarded and skimmed. Brand new bathroom suites installed, including floor to ceiling tiling. Brand new Kitchen fitted. Decorated throuughout.