This home investment project required our quality workmanship throughout a 4 month period which included: loft conversion extension; basement refit - shower, stud, gym, utility and cinema rooms; kitchen and bathroom remodelling; construction of new suspended ceiling, partitions; rendering, plastering, skimming, decorating, painting walls, ceilings; Basement electrical rewiring and extending the existing electrical installation; adjusting the old plumbing or installing new pipework; heating installation; tiling walls, floor; bi-fold doors, windows installations, other carpentry jobs such as cupboards and cinema TV recess; floating engineered oakwood floor fitting; installing bath and toilet sanitary units, mechanical extrator fan. Garden remote lighting system installation