Location: Weoley Castle Road, Birmingham
Client: Lloyds / Mitie
Description: The building needed work as it was suffering from severe water ingress due to a failing flat roof.
After multiple cases of water ingress, T & D were employed by Mitie on behalf of Lloyds Bank to work on the flat roof at the branch. We worked alongside Centaur to complete a full extensive survey to ascertain the causes of water ingress, and compiled a full specification on the remedial works required.
The installation itself was challenging, with numerous upstand details, plant, gulley’s and drainage systems all adding to the complexity of the project. As safety is always our top priority, we worked together with one of our trusted contractors (OMEGA scaffolding) to ensure the required access equipment and edge protection was all in place to ensure the Health and Safety of our staff, the client and general public.
Overcoming all of the challenges presented, the final result was a complete overhaul of the roof space and a single point guarantee of 10 years has been placed on the finished product, much to the delight of the staff in the branch!
See photos for the roof before and after.