Scope
Strip out all bathrooms flooring and kitchen
New structural openings, new doors, architraves, skirtings, bathrooms and kitchen, marble floor tiling to hall and bathrooms, polished plaster and decorate
A family hoe was completely burnt out, DMB undertook the whole project from conception to completion.
From strip out and demo.
Electrical and plumbing.
Plastering.
Flooring.
Kitchen design and install.
Bathroom install.
Carpentry.
Wardrobe.
Vinyl flooring.
Doors architraves and skirtings supplied and fitted.
Fire stopping.
Fire and smoke alarms.
20 new build 1-2 and 3 bedroom units at Kingston
Drainage. foundations,
Steel frame. hollow core and block and brick. VCL roof , window install oversaw all on-site activity, coordination of the on-site trades, briefing and quality control of specialist sub-contractors
VCL roof membrane
Completed membrane VCL to a 20 unit new build at Kingston
A family home at Hampstead, complete refurbishment with new extension
Reconfigure home to suit new home owners layout and design
Parquet flooring
Wet underfloor heating
Air condition
Painting
Pointing
Fire places
Electrical. gas and plumbing
Marble fireplaces Marble stairs
Complete internal renovation of bedrooms, kitchen and bathrooms
Completed works as clients and interior design
UFH
Electrical.
Plumbing.
Decorating.
Flooring
Floor and wall tiling.