The Federation of Master Builders

McMurray and Martin Ltd

McMurray and Martin Ltd, Weymouth, Weymouth, DT4 9TJ

Trading Address

Unit 17,
59 Cambridge Road,
Granby Industrial Estate,
Weymouth,
Weymouth,
United Kingdom.
DT4 9TJ

Contact

Tel: 01305542012
Contact: Email us
Website: http://www.mcmurrayandmartin.co.uk/

When calling, please remember to say you got their number from the FMB website

Member details

Joined: 22/09/2010


Summary

McMurray and Martin Ltd are winners of the 2019 Federation of master builders medium size project in the south west. We were named outright winners in this category from hundreds of nominations. We were also reginal finalists at the local authority building control awards 2019. 

 

McMurray and Martin Ltd are focused on exceptional high standards which all there work is produced too. Having already gained a reputation based on quality and good customer satisfaction, we are committed to giving our customers value for money.

 
We are a highly motivated team which can deliver a tailored service which is based on the customers needs and attention to detail.

 
Every stage of the job is carefully planned out from offering free quotation at a time that suits you. The undertaking of the work is carried out with minimal disruption to you. All work comes with a one year guarantee. 
 

All of our tradesmen are City and Guilds qualified as well as being CSCS health and safety card holders. Our work is completed on time and in accordance with current building regulations.


Case Studies

MCMURRAY-AND-MARTIN-LTD_INTERNAL-RECONFIGURATION-_01_20190122T003324
MCMURRAY-AND-MARTIN-LTD_INTERNAL-RECONFIGURATION-_02_20190122T003325

Internal reconfiguration

22/01/2019

 

McMurray and Martin Ltd was entrusted to carry out the internal ground floor reconfiguration of this property. Works consisted of removing all internal walls inserting steels and replacing rear lean to roof with new Velux roof windows within. 

 

MCMURRAY-AND-MARTIN-LTD_EXTENSION-_01_20190122T003001
MCMURRAY-AND-MARTIN-LTD_EXTENSION-_02_20190122T003002

extension

22/01/2019

 

McMurray and Martin Ltd was entrusted to carry out the build of two extensions to this 1920s property to allow for modern day living. The front of the extension consists of nearly all glass allowing for natural light to flood the kitchen dining room creating a breath-taking entrance from the misguiding hallway. The cement based cladding is soft suttle tone of green allowing the building to not be to imposing and to pick up the colours of the established willow tree it sits next to.  

 

MCMURRAY-AND-MARTIN-LTD_LOFT-CONVERSION_01_20190122T002704
MCMURRAY-AND-MARTIN-LTD_LOFT-CONVERSION_02_20190122T002705

loft conversion

22/01/2019

McMurray and Martin Ltd was entrusted to carry out the conversion of an unused loft space into a master bedroom complete with ensuite with full glass gable end wall overlooking Weymouth bay.

 

 

 

MCMURRAY-AND-MARTIN-LTD_EXTENSION-_01_20190122T002045
MCMURRAY-AND-MARTIN-LTD_EXTENSION-_02_20190122T002047

extension

22/01/2019

 

McMurray and Martin Ltd was entrusted to carry out the build of two extensions to this 1920s property to allow for modern day living. The front of the extension consists of nearly all glass allowing for natural light to flood the kitchen dining room creating a breath-taking entrance from the misguiding hallway. The cement based cladding is soft suttle tone of green allowing the building to not be to imposing and to pick up the colours of the established willow tree it sits next to.  

 

MCMURRAY-AND-MARTIN-CARPENTRY_KITCHEN-REFERBISHMENT-01_20151029T122244
MCMURRAY-AND-MARTIN-CARPENTRY_KITCHEN-REFERBISHMENT-02_20151029T122244

kitchen referbishment

17/02/2015

This project was to remove the old dated kitchen and install a new modern kitchen. The ceiling was over boarded, plastered and a new lighting ring was installed to allow chrome down lights to illuminate the new kitchen. The kitchen was installed with additional features such as solid oak worktops and breakfast bar. White socket fronts were changed for chrome socket fronts. The walls were tiled along with the floor and painted to complete the kitchen.   

MCMURRAY-AND-MARTIN-CARPENTRY_FULL-COTTAGE-REFERBISHMENT-01_20151029T122244
MCMURRAY-AND-MARTIN-CARPENTRY_FULL-COTTAGE-REFERBISHMENT-02_20151029T122244

full cottage referbishment

17/02/2015

A full refurbishment project carried out by McMurray and Martin Ltd. The specification was high as well as the finishing as this property would be let out as a holiday home. This project consisted of removing a load bearing supporting wall between the kitchen and the dining room to create an open plan kitchen dining area.  Steel was inserted into the ceiling void and purbeck stone pliers were built up either side to give a distinction of the two rooms but still letting the light and space flow freely. The walls in this property were in bad condition and took a lot of time and effort to get them to the finish that was required, never less we achieved this and decorated throughout with finishing touches such as oak flooring to the entire ground floor and oak hand rail up the stairs carried into the balustrade. New ledge and brace doors were installed and finished with hand crafted Suffolk latches as well as the window furniture to match the black iron. New bathroom suit was installed and floor and walls tiled. The master bedroom ensuite door was moved to give a better layout to the ensuite and tiled floor and walls. The finished result has given the client a home which many holiday makers will be able to enjoy.


Message us



;

Stay up to date with consumer news

For regular consumer updates from FMB, sign-up here with your email address.