Facing a potential threat to a resident's static home due to a small landslide, CG Construction carried out an emergency response.
Project Overview
- Road closure implemented for safety.
- Excavation of a 16m-long bank to the required depth and width.
- Auger holes strategically placed, reinforced with RSJs and encased in concrete.
- Timber hardwood sleepers inserted between each section.
- Backfilled with rejects to support the retaining wall.
- Path beside the static home levelled, adorned with shingle, and the existing fence reinstated.
- Surplus spoil efficiently removed by grab.
- Road meticulously swept and reopened within 7 days.
A delighted client and neighbours. Our quick response and expert execution ensured the safety of the static home while maintaining the integrity of the surrounding area.
Read less