Based in Aylesbeare
Excavations and forming of new pond.
Re grading and forming new banks.
Excavations & preparation of levels.
Forming new kerb edgings & reclaimed railway sleeper wall.
Gravel Hard Standing & Re tarmac drive
Excavations and preparation of sub base.Laying new edging kerbs & raised flower bed.Tarmac resurfacing.
Fabrication & installation of new Home Office.
Raised Decking area & sleeper steps, incorporating raised vegetable bed & compost bins.
Infill porch with new oak windows & door.
Replacement of hip & ridge tile using new dry hip & ridge system.
Groundworks & retaining walls.
Construction to D.P.C & drainage.
Completion of all internal works and finish landscaping.
Base preparation & concreting.
Fabrication of shed frame, erected on site and clad.
Finished with a Brazilian slate roof.
Demolition of existing out buildings.
Groundworks up to D.P.C Level & Floor finishing.
Roof covering and internal fit out.
Phase 1 of Barn Conversion
Structural masonry work, Internal & external.
Removal of old roof covering & replaced with new.