Complex Structural Rebuild & Additional Floor –
A highly complex structural transformation involving the complete demolition of the first-floor flat while keeping the ground floor fully intact and operational. The project required careful sequencing, temporary propping, underpinning works, and full structural redesign to safely rebuild the first floor and construct an additional new floor above.
All works were carried out under structural engineer design, including underpinning to existing foundations, new load-bearing walls, upgraded floor joists, dormer construction, and full Building Control compliance.
This project demonstrates our capability to deliver technically demanding structural alterations in occupied buildings — protecting the integrity of lower flats while adding significant new living space and value above.#Fixiz #FixizUK