Full bathroom renovation and custom cupboard build to house boiler system. All electrics, plumbing, tiling and flooring completed by us. All plumbing and heating services also carried out by our team.
We created a bespoke media wall after designing it first with the client. All made to measure and with attention to detailing.
We fully stripped the existing bathroom, plumbing and electrical work was carried out to accommodate the new bathroom plan. The bath was being replaced with a shower. Tiling, new bathroom suite installation carried out by us.
A disability kitchen was designed with accessibility in mind for our customer. We removed the old kitchen, installed new flooring and installed the kitchen units and appliances. We moved services to accommodate the new kitchen design.
We reconstructed an existing patio, created steps and installed tiles for our customer as well as replacing all fencing around the garden.
After we created a single side extension for our client to incorporate a newly designed kitchen which was also installed by us. Our client wanted to utilise the previous kitchen area and make it blend in with the rest of the house.
Fence panels, gravel boards and concrete posts replaced with new. Patio constructed by us and tiles laid down.
New kitchen installed in the single storey side extension that was built by us in Potters Bar.
We constructed this single storey side extension for our lovely client. From digging for the piling to the construction of the roof, all work carried out by us.
This partial bathroom renovation consisted of removing wall tiles and enclosed shower area. We replaced tiled area with bathroom panels and painted walls. We put in a new enclosed shower unit/ shower and vanity unit.
We carried out a full house renovation for our client which included structural alterations to open up the ground floor and turn the front room and dining room into a through lounge. New flooring laid in all rooms and a bespoke media wall designed and created. Flat roof also replaced.
Read lessKitchen and bathroom renovation consisted of taking existing wall tiles down and re plastering the walls. Plumbing and electric alterations were made to accommodate the new kitchen. Kitchen units and appliances installed by us. Bathroom installed by Gosai Heating and Gas.
Read lessBathroom project consisted of us removing existing bathroom and taking the walls back to brick. Plumbing and heating pipes renewed as per bathroom plan and new walls created. Floor was also reconstructed and new flooring laid. Walls were tiled/painted and then bathroom suite and towel rail installed.
Read lessKitchen and bathroom renovation completed for this customer. Walls were already prepared for us up to plaster. So we completed the flooring with tiles and the bathroom walls with tiles, then installed the bathroom suite and new kitchen units.
We boarded out this customers loft so she could have more space for storage. We installed an electric loft ladder for ease of access and completed as per customers request. We also made space and installed a Velux window.
We re constructed the floor after it was damaged from a leaking pipe underground. We stopped the leak, removed damp floor boards, laid new floor boards and new herringbone flooring.
our client wanted a full renovation with a high finish of this 3 bed penthouse so we completely stripped it back, re wired, re plumbed, lay new floor everywhere, boarded walls and ceilings, skimmed everywhere and decorated. no stone was left unturned with this job. please see photos.
Read lessWe completed this huge outbuilding that was started by rouge builders. Customers got in touch with us when they were left disappointed by the work of previous builders. We plastered, and constructed a new screed floor in preparation for tiling that was also carried out by us. Customers were left happy and satisfied with our work.
Read lessProject consisted of existing kitchen being completely removed including flooring. Electrics and plumbing adjusted according to new kitchen plan. New flooring installed along with kitchen units, appliances and sink/tap.
Full renovation of a one bed flat, walls skimmed and decorated. Plumbing and electrics adjusted as per new Howdens kitchen plan and units installed by us. New bathroom suite installed by us. Wardrobes designed and supplied by Howdens and built by us.
Read less2 Bed flat refurb consisted of existing kitchen being removed. New partitions constructed, new kitchen and new bathroom installed. Staircase refurbed, rooms re decorated.
Restoration of church, existing windows refurbed, back, side and front of building decorated.
Garden transformation completed by Gosai Construction. New steps created and new paving laid.
Kitchen renovation consisted of removing existing kitchen, electrics and plumbing work adjusted to accommodate new kitchen. Kitchen units installed as well as new flooring. Appliances and sink also installed by Gosai construction.
Garage conversion completed to make garage space more useful for our customers. Existing garage door removed and brickwork carried out to accommodate new window and door. Flooring laid and plumbing works carried out to supply the washing machine and dog shower.
Read lessGarage conversion completed by Gosai construction. Existing garage door removed and new brick opening created to accommodate new window and door. Internally walls plastered and decorated, new floor constructed and flooring laid.
Existing outhouse taken down and new foundations applied before constructing new brick and block outhouse. New ceiling and concrete flooring constructed. Outbuilding rendered externally.
Complete kitchen renovation, removal of existing kitchen. New electrics, plumbing, new flooring and kitchen installation.
We love to transform our customers garden as per their own ideas or we can draw up a plan and put some ideas forward.
Full bathroom renovation. Plumbing, tiling and bathroom suite all installed by us.
Single storey rear extension and full house renovation carried out in Southgate. All new plumbing and electrics installed. New windows and doors throughout the property as well as a new driveway and new garden.
Full house renovation with rear extension. New joists, new floorboards, new walls constructed. All plumbing works, heating and bathroom installation carried out by Gosai Heating and Gas. House fully rendered, with paving to the front of the property and full back garden transformation.
Read lessFull living room renovation. Room taken back to brick, new floor boards laid, new radiators and new flooring installed. Fire place tiled and whole room decorated.
Conversion of an existing outbuilding to a studio flat. Brickwork to accommodate new door opening, kitchen and bathroom installation and new flooring installed.
External Silicon based rendering carried out around the whole property.
Kitchen renovation completed by Gosai Construction. Full gut out of existing kitchen, new kitchen units installed along with new flooring.
Full Bathroom Renovation. Removal of existing Bathroom, new plumbing, electrics, flooring and Bathroom suite installation.
Bathroom renovation, full gutting of existing bathroom. New plumbing, electrics, tiling, flooring and bathroom suite installation.
Outhouse project consisted of digging for the foundation and drainage. Construction of the shell, external render. Internally walls were built and plastered. Kitchen and bathroom installation was carried out by us. All decorating, plumbing and electrics carried out by Gosai Construction.
Read lessShop renovation consisted of gutting out the shop, plumbing, full electrics, spraying aluminium front. Internally we boarded all walls, constructed new ceiling and suspended for LED lighting. Walls were skimmed, decorated and a feature wall was installed. Flooring was installed as well as a kitchen and WC. Bespoke furniture was created and all fixtures and fittings were installed by us.
Beautiful Single Storey Side Rear Extension.
This project was independently inspected as part of the joining criteria to become a Master Builder with the FMB
Foundations were dug and filled. Brick and block work was required as well as the external walls rendered to match the existing walls.The roof was constructed, made watertight and matching roof tiles were laid. Internally, the floor was constructed and the windows and main door were installed by us. All electrics, boarding, skimming, decorating, tiling and carpentry was carried out by Gosai Construction.
Kitchen renovation consisted of a full gut out, plumbing and electrical alterations. Skimming, decorating, kitchen installation and flooring installation.
The job consisted of dropping the ground level, concrete slab for patio, digging and filling footings. Flowerbed walls were constructed as well as re-constructing the garden steps. The new constructed steps were slabbed.
This flat renovation involved removing the existing kitchen and bathroom. We waterproofed the kitchen and bathroom floors before installing a new kitchen and re installing the existing bathroom suite. We made alterations to the property, decorated it fully and installed new radiators and new flooring throughout the flat.
Read lessThis full renovation consisted of new electrics and new plumbing throughout the property. We suspended ceilings, skimmed the walls, carried out various carpentry requirements as well as decorating the property. We carried out tiling in the Bathroom as well as installing the bathroom suite and Kitchen installation. Flooring was installed by us throughout the property.
Outhouse and Garden project. The outhouse consisted of block work and render, internally walls were built, plastered and decorated. Plumbing and electrical work was carried out as well as a bathroom installation. The garden project consisted of constructing a concrete patio, new soil, new lawn and tiling. Flowerbeds were created on either side of the garden.
Read less6 Meter rear extension. This project consisted of installing new beams, block work and rendering. Internally walls were built, plastered and decorated. New electrics, plumbing and flooring installation carried out by us.
Garden transformation consisted of preparing for new concrete posts in order to secure new fence panels. Slabs were placed on concrete patio, garden was prepared for paving to be laid in a design and new lawn turf was laid down.
Outhouse construction consisted of block work to create the shell, constructing the roof, rendering the outside and boarding internally. Internal walls were plastered and decorated, tiles were laid on the floor. Paving blocks were used to create the steps outside.
Read lessThis project consisted of an extension, windows, bifold and lantern installation. The full renovation included bathrooms, kitchen, plumbing, electrics, decorating and new flooring. The driveway, boundary walls, railings and gate also installed and carried out by Gosai Construction.
Read less