𝑾𝒉𝒂𝒕 𝒂𝒏 𝒂𝒎𝒂𝒛𝒊𝒏𝒈 𝒑𝒓𝒐𝒋𝒆𝒄𝒕 𝒇𝒓𝒐𝒎 𝒔𝒕𝒂𝒓𝒕 𝒕𝒐 𝒇𝒊𝒏𝒊𝒔𝒉 🪜 🔨
This job entailed removing the existing kitchen, utility room, downstairs toilet, removing a load bearing wall to enlarge the lounge and to add a bar area. 🍸👌🏼
A new kitchen was installed into another room of the house and the old kitchen was made into a new utility room along with a new boiler, a bigger downstairs toilet was also installed.
All new designer radiators were fitted on the ground floor along with tiling to the hall and kitchen floors & fitting laminate flooring through the ground floor complete with new skiting boards and new oak doors.
We also installed several new electrical points and spotlights. 💡
Read less