33B Haven Green: Scope of Works (Ref: F/2025/0561)
1. Demolition & Site Setup
Strip warehouse to shell; remove slab, 1st floor, and roof.
Erect 3-storey scaffold per Party Wall Agreements.
2. Groundworks & Utilities
Excavate 1000mm trench footings (subject to inspection).
Install new mains water, power, and 110mm fire-stopped drainage.
Full electrical rewire and boiler installation.
3. Structural Rebuild
Erect 350mm cavity walls and a fibre-cement mansard roof.
Install S355 steelwork and C24 timber joists per Rev B Report.
4. Fire Safety & Fit-Out
Construct 30-min fire-protected stairway with FD30 doors.
Install interlinked LD3 smoke alarms and PAS 24 security joinery.
Build 1-bed dwelling with kitchen (60L/s extract) and 3 bathrooms.
5. Circulation
Install compliant timber staircases for 1st and 2nd-floor access.