The project consists of a bathroom renovation and utility room refurbishment.
The bathroom has been taken back to brickwork, the floors in both the utility room and bathroom
have been dug out, tanked and a new floor screed laid, underfloor heating has been installed
throughout, the utility room floor has then been tiled to match the hallway, new runner kitchen
units and plumbing works have been installed and consumer unit. In the bathroom the ceiling has
been re-plastered and decorated with new lighting fitted, walls have been tanked and stud
framework fixed for moisture resistant plaster board, walls and floors have then been tiled and
wallpapered, a toilet, sink unit and shower with a niche built into the wall have been installed