Installation of new interlocking roof tiles + 270mm of insulation added to loft space in accordance with building regulations.
Installation of new breathable felt membrane to pitched roof in Crowborough. Installation of new solar panells to front pitch of property.
Installation of new tiled roof to entire property. Installation of single ply EPDM flat roof.
Installation of new cut to fall flat roof + installation. New single ply flat roof installed.
Installation of new cut to fall flat roof + installation. New single ply flat roof installed.
Installation of new tiled roof to entire property. Installation of single ply EPDM flat roof.
Replacement of old felt flat roof. Installation of new GRP fibreglass flat roof system.
Installation of tiled roof, velux windows + flat roof instalation.
Installation of new roof light + Restec flexi GRP single ply flat roof system.
Installation of new soffit, fascia+ guttering to entire property.
The roof has been fully stripped off with a new breathable felt and roofing battens installed. Work was in progress to clad the roof with new slates.
The flashing around the chimney on the front elevation of the roof was been replaced and the lead valley on the rear elevation has been renewed along with the skirt around the soil pipe.
This inspection was undertaken by the British Board of Agrement (The BBA) on behalf of the Federation of Master Builders.