The Black Olive in central London, Barbican which was a cafe bistro conversion from greasy spoon cafe based on 2 floors including new customer toilets, rewiring, brand new kitchen installation with extraction, new cold room installation and air conditioning units, new flooring walls and ceiling, approx 600square metre tiling, signage and new shop front. The time taken to complete this large size unit is 16 weeks.
Read less