In side the holiday cabin referbishments, we removed all non supporting walls and tongue and groove (t&g) cladding, insulated all outside walls. new timber stud work was errected. the whole building was re-wired. New false A frames were built in. The walls were plaster boarded and skimmed. Brand new bathroom suites installed, including floor to ceiling tiling. Brand new Kitchen fitted. Decorated throuughout.